0 By Gengler DESIGN In Posted 20. August 2018Construction Stage SixExpansion of storage area to a total of 7800 m² Construction of technical cleanliness laboratory complying with VDA 19 READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Construction Stage FiveExtension to 7500 m² Expansion of Logistics and Final Assembly READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Construction Stage FourExtension to 5000 m² Distinct areas for Logistics, Cleaning and Packaging READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Founder Rolf Mannhardt passes awayManfred Fellhauer is announced CEO READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Construction Stage TwoExpansion of manufacturing area to 3000 m² READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Construction Stage Oneat current location with an area of about 2000 m² READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Purchase of first corporate buildingin Dauchingen READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Production of first parts in contract manufacturingIncreasing demand in stamped components from constructed tools READ MORE
0 By Gengler DESIGN In Posted 20. August 2018Founding of R. Mannhardt GmbHin a garage in Villingen-Schwenningen READ MORE